Project
Two-tone farmhouse in Sellwood
Service
Exterior painting
Area
Sellwood
Duration
6 days


01
What the house needed
Twenty years of sun had chalked the siding and the shutters were peeling back to bare wood. The owners wanted a brighter house that still felt like theirs.
02
How we did it
We washed, scraped and sanded every board, replaced two rotten trim pieces and primed bare wood. Then two coats of satin on the siding and a deep plum on the shutters and door.


03
How it’s held up
It came through a full Portland winter without a single flake, and it’s backed by our 3-year workmanship warranty.
Gallery
On site




They found rot we didn’t know about, fixed it properly and still finished a day early. The house looks brand new.
Dana and Chris P.
Get this template free